Automation index
How much of a Shellfish gatherer’s job can AI already do?
A tide sheet comes earlier. Taking the quota without emptying the bed do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Shellfish gatherer
18%
AI can already do 18% of this job.
#580 / 643
View rankingShellfish gatherer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Tide, quota and the day’s permit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Bed, rake and the cold in the legs.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Grade, size and what goes back.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Market, the price and the one who does not declare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The toxin, the closure and not going out anyway.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
The quota, and not emptying the bed.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tide
- quotas
- shellfish beds
- minimum sizes
- the market
- biotoxins
- the rake
- gathering permits
Sources for this job· O*NET 45-3011.00· ESCO/ISCO 6221
IS WORK OVER?
Mason
15%
#627 / 643
View rankingMason
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, measure and order material.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 30% | +4.8 |
Setting out and levels on site.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Raise walls, render and plaster.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Floors, tiling and finishing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Safety, scaffolding and clearing the bay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Coordinate with foreman, plumber and electrician.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- build walls
- plaster
- site work
- Read drawings, measure and order material
- Setting out and levels on site
- Raise walls, render and plaster
- Floors, tiling and finishing
- Safety, scaffolding and clearing the bay
- albanil
- mason
Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112