Automation index
How much of a Shellfish gatherer’s job can AI already do?
A tide sheet comes earlier. Taking the quota without emptying the bed do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Shellfish gatherer
18%
AI can already do 18% of this job.
#570 / 633
View rankingShellfish gatherer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Tide, quota and the day’s permit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Bed, rake and the cold in the legs.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Grade, size and what goes back.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Market, the price and the one who does not declare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The toxin, the closure and not going out anyway.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
The quota, and not emptying the bed.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tide
- quotas
- shellfish beds
- minimum sizes
- the market
- biotoxins
- the rake
- gathering permits
Sources for this job· O*NET 45-3011.00· ESCO/ISCO 6221
IS WORK OVER?
Process engineer
26%
#205 / 633
View rankingProcess engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
P&IDs, balances and the operating procedure.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Plant, trials and the real bottleneck.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Capacity, yields and the improvement report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Start-up, shutdown and the shift that skips the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Process safety and the HAZOP that hurts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Not overloading the reactor, and signing the change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- P&IDs
- mass balances
- HAZOP
- plant start-up
- improve yields
- SOP
- bottlenecks
- process safety
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141