IS WORK OVER?

Automation index

How much of a Shellfish gatherer’s job can AI already do?

A tide sheet comes earlier. Taking the quota without emptying the bed do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Shellfish gatherer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Tide, quota and the day’s permit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Bed, rake and the cold in the legs.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Grade, size and what goes back.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Market, the price and the one who does not declare.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The toxin, the closure and not going out anyway.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
The quota, and not emptying the bed.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tide
  • quotas
  • shellfish beds
  • minimum sizes
  • the market
  • biotoxins
  • the rake
  • gathering permits

Sources for this job· O*NET 45-3011.00· ESCO/ISCO 6221

Structural engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, combinations and the calculation annex.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Site, rebar and what was not poured that way.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Code, building regs and the sizing note.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Pathology, the crack and shore or not.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The architect, the deadline and not trimming the depth.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Sign that it stands, and not hiding the assumption.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • calculate structures
  • frame model
  • calculation annex
  • building regs
  • rebar
  • structural pathology
  • load combinations
  • shore

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 567Gas fitter18%
  2. 568Gardener18%
  3. 569Train driver18%
  4. 571Stonemason18%
  5. 572Port crane operator18%
  6. 573Tower crane operator18%