Automation index
How much of a Shepherd’s job can AI already do?
GPS collars come earlier. Bringing the whole flock without leaving one on the hill do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Shepherd
18%
AI can already do 18% of this job.
#585 / 643
View rankingShepherd
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Route, grazing and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Flock, dogs and the wolf.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Shearing, lambing and the one that stays.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Cheese, milk and dealing with the dairy.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The hill, the snow and not missing the pass.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
The whole flock, and not leaving one behind.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- run the flock
- sheepdogs
- lambing
- shearing
- the wolf
- passes
- ewe’s milk
- hill grazing
Sources for this job· O*NET 45-2093.00· ESCO/ISCO 6121
IS WORK OVER?
Aerospace engineer
25%
#233 / 643
View rankingAerospace engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calculate, simulate and certify structures and systems.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Drawings, tolerances and traceability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bench, test flight and incidents.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Vendors, quality and EASA.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Documentation, versions and configuration.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign something that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Drawings, tolerances and traceability
- Bench, test flight and incidents
- Vendors, quality and EASA
- Documentation, versions and configuration
- Sign something that will not fall
- ingeniero aeronautico
- aerospace engineer
Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144