Automation index
How much of a Shepherd’s job can AI already do?
GPS collars come earlier. Bringing the whole flock without leaving one on the hill do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Shepherd
18%
AI can already do 18% of this job.
#585 / 643
View rankingShepherd
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Route, grazing and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Flock, dogs and the wolf.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Shearing, lambing and the one that stays.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Cheese, milk and dealing with the dairy.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The hill, the snow and not missing the pass.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
The whole flock, and not leaving one behind.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- run the flock
- sheepdogs
- lambing
- shearing
- the wolf
- passes
- ewe’s milk
- hill grazing
Sources for this job· O*NET 45-2093.00· ESCO/ISCO 6121
IS WORK OVER?
Cabin manager
20%
#476 / 643
View rankingCabin manager
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Briefing, door assignment and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Cabin, the difficult passenger and turbulence.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Service, allergies and the one who is ill.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Safety, the demo and the kit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Delay, overbooking and the one who will not sit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Evacuate for real, and sign the cabin.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- cabin briefing
- assign doors
- difficult passenger
- safety demo
- onboard allergies
- overbooking
- evacuate
- turbulence
Sources for this job· O*NET 53-2031.00· ESCO/ISCO 5111