IS WORK OVER?

Automation index

How much of a Shepherd’s job can AI already do?

GPS collars come earlier. Bringing the whole flock without leaving one on the hill do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Shepherd

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Route, grazing and the day’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Flock, dogs and the wolf.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Shearing, lambing and the one that stays.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cheese, milk and dealing with the dairy.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The hill, the snow and not missing the pass.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
The whole flock, and not leaving one behind.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • run the flock
  • sheepdogs
  • lambing
  • shearing
  • the wolf
  • passes
  • ewe’s milk
  • hill grazing

Sources for this job· O*NET 45-2093.00· ESCO/ISCO 6121

Chemist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Protocols, calcs and safety sheets.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Batch reports, charts and docs.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Synthesis, titration and sample handling.
Estimate

No public source provides a precise figure. This is our estimate.

18%15%+2.7
Read a strange result and repeat it.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Plant safety and waste.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Sign quality and talk to production.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Protocols, calcs and safety sheets
  • Batch reports, charts and docs
  • Synthesis, titration and sample handling
  • Read a strange result and repeat it
  • Plant safety and waste
  • Sign quality and talk to production
  • quimico
  • chemist
  • laboratorio quimico

Sources for this job· O*NET 19-2031.00· ESCO/ISCO 2113

Analyse my job

Jobs with similar scores

  1. 582Port crane operator18%
  2. 583Tower crane operator18%
  3. 584Excavator operator18%
  4. 586Vehicle painter18%
  5. 587Podiatrist18%
  6. 588Civil protection volunteer18%