IS WORK OVER?

Automation index

How much of a Shepherd’s job can AI already do?

GPS collars come earlier. Bringing the whole flock without leaving one on the hill do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Shepherd

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Route, grazing and the day’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Flock, dogs and the wolf.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Shearing, lambing and the one that stays.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cheese, milk and dealing with the dairy.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The hill, the snow and not missing the pass.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
The whole flock, and not leaving one behind.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • run the flock
  • sheepdogs
  • lambing
  • shearing
  • the wolf
  • passes
  • ewe’s milk
  • hill grazing

Sources for this job· O*NET 45-2093.00· ESCO/ISCO 6121

Chimney sweep

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Inspection, camera and the flue report.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, sweep and the nest that blocks.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Tightness, draught and the one that will not draw.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Certificate, rules and the residents.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wet roof and not falling.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Clean for real, and not leaving loose soot.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • sweep chimneys
  • flue camera
  • draught
  • flue certificate
  • nests
  • roofs
  • tightness
  • soot

Sources for this job· O*NET 47-4071.00· ESCO/ISCO 7133

Analyse my job

Jobs with similar scores

  1. 572Port crane operator18%
  2. 573Tower crane operator18%
  3. 574Excavator operator18%
  4. 576Vehicle painter18%
  5. 577Podiatrist18%
  6. 578Civil protection volunteer18%