Automation index
How much of a Shepherd’s job can AI already do?
GPS collars come earlier. Bringing the whole flock without leaving one on the hill do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Shepherd
18%
AI can already do 18% of this job.
#695 / 753
View rankingShepherd
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Route, grazing and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Flock, dogs and the wolf.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Shearing, lambing and the one that stays.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Cheese, milk and dealing with the dairy.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The hill, the snow and not missing the pass.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
The whole flock, and not leaving one behind.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- run the flock
- sheepdogs
- lambing
- shearing
- the wolf
- passes
- ewe’s milk
- hill grazing
Sources for this job· O*NET 45-2093.00· ESCO/ISCO 6121
IS WORK OVER?
Corrosion engineer
22%
#390 / 753
View rankingCorrosion engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Thicknesses, the map and the coupon.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the pipe and the one that is thin.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Cathode, the protection and the one that will not take.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shutdown, the coating and not painting over rust.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Operations, the rush and not leaving the thin one in service.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Stop before it goes, and not painting over it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- thicknesses
- corrosion maps
- cathodic protection
- coatings
- thin pipes
- shutdowns
- rust
- coupons
Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2145