Automation index
How much of a Shepherd’s job can AI already do?
GPS collars come earlier. Bringing the whole flock without leaving one on the hill do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Shepherd
18%
AI can already do 18% of this job.
#705 / 763
View rankingShepherd
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Route, grazing and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Flock, dogs and the wolf.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Shearing, lambing and the one that stays.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Cheese, milk and dealing with the dairy.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The hill, the snow and not missing the pass.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
The whole flock, and not leaving one behind.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- run the flock
- sheepdogs
- lambing
- shearing
- the wolf
- passes
- ewe’s milk
- hill grazing
Sources for this job· O*NET 45-2093.00· ESCO/ISCO 6121
IS WORK OVER?
Geomatics engineer
22%
#412 / 763
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165