IS WORK OVER?

Automation index

How much of a Shepherd’s job can AI already do?

GPS collars come earlier. Bringing the whole flock without leaving one on the hill do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Shepherd

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Route, grazing and the day’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Flock, dogs and the wolf.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Shearing, lambing and the one that stays.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cheese, milk and dealing with the dairy.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The hill, the snow and not missing the pass.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
The whole flock, and not leaving one behind.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • run the flock
  • sheepdogs
  • lambing
  • shearing
  • the wolf
  • passes
  • ewe’s milk
  • hill grazing

Sources for this job· O*NET 45-2093.00· ESCO/ISCO 6121

Hydrogen technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
ATEX, purge and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Electrolyser, the stack and the one that drops.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Leak, detector and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Charge, the tube and not mixing with air.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the station and not skipping the purge.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No leak, and the protocol done.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • ATEX
  • purge
  • electrolyser
  • H2 detectors
  • stacks
  • hydrogen stations
  • leaks
  • mix with air

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 592Port crane operator18%
  2. 593Tower crane operator18%
  3. 594Excavator operator18%
  4. 596Vehicle painter18%
  5. 597Podiatrist18%
  6. 598Civil protection volunteer18%