IS WORK OVER?

Automation index

How much of a Shepherd’s job can AI already do?

GPS collars come earlier. Bringing the whole flock without leaving one on the hill do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Shepherd

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Route, grazing and the day’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Flock, dogs and the wolf.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Shearing, lambing and the one that stays.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cheese, milk and dealing with the dairy.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The hill, the snow and not missing the pass.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
The whole flock, and not leaving one behind.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • run the flock
  • sheepdogs
  • lambing
  • shearing
  • the wolf
  • passes
  • ewe’s milk
  • hill grazing

Sources for this job· O*NET 45-2093.00· ESCO/ISCO 6121

Power-plant operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-point, parameters and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Room, alarms and the one that trips.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Start, stop and not skipping the SOP.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Maintenance, isolation and the permit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The peak, the grid and not forcing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The set-point, and not tripping.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • set-points
  • control room
  • plant SOP
  • starts
  • isolations
  • alarms
  • dispatch
  • the grid

Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131

Analyse my job

Jobs with similar scores

  1. 582Port crane operator18%
  2. 583Tower crane operator18%
  3. 584Excavator operator18%
  4. 586Vehicle painter18%
  5. 587Podiatrist18%
  6. 588Civil protection volunteer18%