IS WORK OVER?

Automation index

How much of a Shepherd’s job can AI already do?

GPS collars come earlier. Bringing the whole flock without leaving one on the hill do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Shepherd

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Route, grazing and the day’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Flock, dogs and the wolf.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Shearing, lambing and the one that stays.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cheese, milk and dealing with the dairy.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The hill, the snow and not missing the pass.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
The whole flock, and not leaving one behind.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • run the flock
  • sheepdogs
  • lambing
  • shearing
  • the wolf
  • passes
  • ewe’s milk
  • hill grazing

Sources for this job· O*NET 45-2093.00· ESCO/ISCO 6121

Prompt engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Design prompts, tools and chains.
Estimate

No public source provides a precise figure. This is our estimate.

24%58%+13.9
Evals, datasets and regressions.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Integrate with product and safety limits.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Talk to the business about a good output.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Watch hallucinations, bias and cost.
Estimate

No public source provides a precise figure. This is our estimate.

14%20%+2.8
Decide what the model gets, and what it does not.
Estimate

No public source provides a precise figure. This is our estimate.

12%16%+1.9
Total100%34%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Design prompts, tools and chains
  • Evals, datasets and regressions
  • Integrate with product and safety limits
  • Talk to the business about a good output
  • Watch hallucinations, bias and cost
  • prompt engineer
  • ingeniero de prompts
  • llm engineer

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2512

Analyse my job

Jobs with similar scores

  1. 582Port crane operator18%
  2. 583Tower crane operator18%
  3. 584Excavator operator18%
  4. 586Vehicle painter18%
  5. 587Podiatrist18%
  6. 588Civil protection volunteer18%