IS WORK OVER?

Automation index

How much of a Shepherd’s job can AI already do?

GPS collars come earlier. Bringing the whole flock without leaving one on the hill do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Shepherd

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Route, grazing and the day’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Flock, dogs and the wolf.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Shearing, lambing and the one that stays.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cheese, milk and dealing with the dairy.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The hill, the snow and not missing the pass.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
The whole flock, and not leaving one behind.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • run the flock
  • sheepdogs
  • lambing
  • shearing
  • the wolf
  • passes
  • ewe’s milk
  • hill grazing

Sources for this job· O*NET 45-2093.00· ESCO/ISCO 6121

Requirements engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Workshop, the actor and the requirement.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Conflict, the loudest and not swallowing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Criterion, the test and not leaving it vague.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Change, the impact and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The project lead, the deadline and not cutting the one that matters.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it is needed, and not the loudest one's.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • requirements
  • actor workshops
  • acceptance criteria
  • change impact
  • backlog
  • tests
  • not swallow the loudest
  • ambiguity

Sources for this job· O*NET 15-1299.00· ESCO/ISCO 2511

Analyse my job

Jobs with similar scores

  1. 702Port crane operator18%
  2. 703Tower crane operator18%
  3. 704Excavator operator18%
  4. 706Vehicle painter18%
  5. 707Podiatrist18%
  6. 708Civil protection volunteer18%