Automation index
How much of a Shepherd’s job can AI already do?
GPS collars come earlier. Bringing the whole flock without leaving one on the hill do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Shepherd
18%
AI can already do 18% of this job.
#585 / 643
View rankingShepherd
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Route, grazing and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Flock, dogs and the wolf.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Shearing, lambing and the one that stays.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Cheese, milk and dealing with the dairy.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The hill, the snow and not missing the pass.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
The whole flock, and not leaving one behind.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- run the flock
- sheepdogs
- lambing
- shearing
- the wolf
- passes
- ewe’s milk
- hill grazing
Sources for this job· O*NET 45-2093.00· ESCO/ISCO 6121
IS WORK OVER?
Well driller
19%
#544 / 643
View rankingWell driller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Location, permit and the progress log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drill, case and the collapse.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Mud, samples and the geological log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Yield test, pump and the water analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The owner, the neighbour and the well that will not yield.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Clean water, and not leaving a blind well.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drill wells
- case
- yield test
- drilling mud
- geological log
- samples
- well pumps
- drilling permits
Sources for this job· O*NET 47-5023.00· ESCO/ISCO 8113