Automation index
How much of a Ship agent’s job can AI already do?
An ETA comes earlier. Clearing the ship without extra demurrage do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Ship agent
26%
AI can already do 26% of this job.
#229 / 733
View rankingShip agent
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
ETA, berth and port services.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Clearance, crew and the crew change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
The master, the terminal and the window clash.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Invoices, disbursements and the owner’s account.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The inspection, the delay and not losing the slot.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
No extra demurrage, and the ship cleared.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- ETAs
- berths
- ship clearance
- crew changes
- disbursements
- terminal windows
- owner’s accounts
- port inspections
Sources for this job· O*NET 43-5011.00· ESCO/ISCO 3331
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142