Automation index
How much of a Ship agent’s job can AI already do?
An ETA comes earlier. Clearing the ship without extra demurrage do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Ship agent
26%
AI can already do 26% of this job.
#195 / 623
View rankingShip agent
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
ETA, berth and port services.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Clearance, crew and the crew change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
The master, the terminal and the window clash.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Invoices, disbursements and the owner’s account.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The inspection, the delay and not losing the slot.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
No extra demurrage, and the ship cleared.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- ETAs
- berths
- ship clearance
- crew changes
- disbursements
- terminal windows
- owner’s accounts
- port inspections
Sources for this job· O*NET 43-5011.00· ESCO/ISCO 3331
IS WORK OVER?
Mining engineer
22%
#341 / 623
View rankingMining engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model deposit, blast and rates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Drawings, permits and mining plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Face, safety and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Plant, contractors and output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Restoration, waste and regulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a miner below.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model deposit, blast and rates
- Drawings, permits and mining plans
- Face, safety and ventilation
- Plant, contractors and output
- Restoration, waste and regulation
- Not leaving a miner below
- ingeniero de minas
- mining engineer
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146