Automation index
How much of a Ship agent’s job can AI already do?
An ETA comes earlier. Clearing the ship without extra demurrage do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Ship agent
26%
AI can already do 26% of this job.
#195 / 623
View rankingShip agent
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
ETA, berth and port services.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Clearance, crew and the crew change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
The master, the terminal and the window clash.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Invoices, disbursements and the owner’s account.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The inspection, the delay and not losing the slot.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
No extra demurrage, and the ship cleared.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- ETAs
- berths
- ship clearance
- crew changes
- disbursements
- terminal windows
- owner’s accounts
- port inspections
Sources for this job· O*NET 43-5011.00· ESCO/ISCO 3331
IS WORK OVER?
Nuclear engineer
24%
#267 / 623
View rankingNuclear engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Neutronics, thermal-hydraulics and the file.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Control room, tests and the set-point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Licence, the regulator and the safety analyses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Outage, reload and spent fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The event, safety culture and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not playing with reactivity, and signing the analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- neutronics
- thermal-hydraulics
- nuclear licence
- reload
- safety analysis
- control room
- spent fuel
- safety culture
Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149