IS WORK OVER?

Automation index

How much of a Shutter installer’s job can AI already do?

A measure and a motor come earlier. Leaving the shutter running true do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Shutter installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, order and the box that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Box, axle and the motor in the opening.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Tape, slats and the one that derails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Program the remote and the limit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The neighbour, the inner courtyard and not scratching the frame.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it runs true, and not leaving a lame box.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • measure shutters
  • fit boxes
  • shutter motors
  • slats
  • limit switches
  • tape
  • program remotes
  • axles

Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115

Data engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Design pipelines, models and orchestration.
Estimate

No public source provides a precise figure. This is our estimate.

24%50%+12
Write SQL, Spark and data tests.
Estimate

No public source provides a precise figure. This is our estimate.

18%45%+8.1
Incidents, quality and lineage in production.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Talk to analysts and negotiate data contracts.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Cloud cost, permissions and PII.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Decide architecture and technical debt.
Estimate

No public source provides a precise figure. This is our estimate.

12%20%+2.4
Total100%31%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Design pipelines, models and orchestration
  • Write SQL, Spark and data tests
  • Cloud cost, permissions and PII
  • Decide architecture and technical debt
  • ingeniero de datos
  • data engineer
  • etl

Sources for this job· O*NET 15-1243.00· ESCO/ISCO 2511

Analyse my job

Jobs with similar scores

  1. 498Mountain guide19%
  2. 499Farrier19%
  3. 500Blacksmith19%
  4. 502Window installer19%
  5. 503Diving instructor19%
  6. 504Climbing instructor19%