IS WORK OVER?

Automation index

How much of a Shutter installer’s job can AI already do?

A measure and a motor come earlier. Leaving the shutter running true do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Shutter installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, order and the box that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Box, axle and the motor in the opening.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Tape, slats and the one that derails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Program the remote and the limit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The neighbour, the inner courtyard and not scratching the frame.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it runs true, and not leaving a lame box.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • measure shutters
  • fit boxes
  • shutter motors
  • slats
  • limit switches
  • tape
  • program remotes
  • axles

Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115

Drainlayer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drawings, cameras and connection logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Open, pipe and set the fall.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Pits, gases and confined spaces.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Street, neighbours and reinstating pavement.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Quantities, extras and the council.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a connection that bursts.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, cameras and connection logs
  • Open, pipe and set the fall
  • Pits, gases and confined spaces
  • Quantities, extras and the council
  • Not leaving a connection that bursts
  • pocero
  • alcantarillado
  • drainlayer

Sources for this job· O*NET 47-2151.00· ESCO/ISCO 7126

Analyse my job

Jobs with similar scores

  1. 498Mountain guide19%
  2. 499Farrier19%
  3. 500Blacksmith19%
  4. 502Window installer19%
  5. 503Diving instructor19%
  6. 504Climbing instructor19%