Automation index
How much of a Shutter installer’s job can AI already do?
A measure and a motor come earlier. Leaving the shutter running true do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Shutter installer
19%
AI can already do 19% of this job.
#511 / 643
View rankingShutter installer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure, order and the box that will not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Box, axle and the motor in the opening.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Tape, slats and the one that derails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Program the remote and the limit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The neighbour, the inner courtyard and not scratching the frame.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it runs true, and not leaving a lame box.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- measure shutters
- fit boxes
- shutter motors
- slats
- limit switches
- tape
- program remotes
- axles
Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115
IS WORK OVER?
Excavator operator
18%
#584 / 643
View rankingExcavator operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, levels and the machine log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Dig, load and the batter that comes in.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Services, the blind pipe and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Maintenance, grease and the pin that snaps.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The labourer, the lorry and covering nobody.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Not breaking what is buried, and leaving a clean formation.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- dig with excavator
- load lorries
- batters
- buried services
- set-out levels
- grease the machine
- formation
- site GPS
Sources for this job· O*NET 47-2073.00· ESCO/ISCO 8342