IS WORK OVER?

Automation index

How much of a Shutter installer’s job can AI already do?

A measure and a motor come earlier. Leaving the shutter running true do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Shutter installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, order and the box that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Box, axle and the motor in the opening.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Tape, slats and the one that derails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Program the remote and the limit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The neighbour, the inner courtyard and not scratching the frame.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it runs true, and not leaving a lame box.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • measure shutters
  • fit boxes
  • shutter motors
  • slats
  • limit switches
  • tape
  • program remotes
  • axles

Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115

Geological engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Boreholes, lab and the geotech profile.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Field, outcrop and what the map misses.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Foundations, slopes and the risk report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Tunnel, water and the support.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The works that move, and stop or go.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Call the ground, and sign the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • geotech profile
  • foundations
  • slopes
  • tunnel support
  • outcrops
  • geological risk
  • ground reports

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 498Mountain guide19%
  2. 499Farrier19%
  3. 500Blacksmith19%
  4. 502Window installer19%
  5. 503Diving instructor19%
  6. 504Climbing instructor19%