IS WORK OVER?

Automation index

How much of a Shutter installer’s job can AI already do?

A measure and a motor come earlier. Leaving the shutter running true do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Shutter installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, order and the box that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Box, axle and the motor in the opening.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Tape, slats and the one that derails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Program the remote and the limit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The neighbour, the inner courtyard and not scratching the frame.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it runs true, and not leaving a lame box.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • measure shutters
  • fit boxes
  • shutter motors
  • slats
  • limit switches
  • tape
  • program remotes
  • axles

Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115

Intensivist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Protocols, scores and the on-call plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Airway, vasopressors and the patient who crashes.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Ventilation, balances and taking the tube out.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Bedside ultrasound and ICU procedures.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Family, limits and the yes or no to admission.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
On-call, the error and owning the bed.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • intubate
  • ICU ventilation
  • vasopressors
  • difficult airway
  • bedside ultrasound
  • limit treatment
  • ICU scores
  • extubate

Sources for this job· O*NET 29-1229.00· ESCO/ISCO 2212

Analyse my job

Jobs with similar scores

  1. 508Mountain guide19%
  2. 509Farrier19%
  3. 510Blacksmith19%
  4. 512Window installer19%
  5. 513Diving instructor19%
  6. 514Climbing instructor19%