IS WORK OVER?

Automation index

How much of a Shutter installer’s job can AI already do?

A measure and a motor come earlier. Leaving the shutter running true do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Shutter installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, order and the box that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Box, axle and the motor in the opening.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Tape, slats and the one that derails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Program the remote and the limit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The neighbour, the inner courtyard and not scratching the frame.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it runs true, and not leaving a lame box.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • measure shutters
  • fit boxes
  • shutter motors
  • slats
  • limit switches
  • tape
  • program remotes
  • axles

Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115

Respiratory therapist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Gases, the ventilator and the protocol.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Wean, the trial and the one who will not hold.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Physio, the sputum and the one who will not cough.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
ICU, the alarm and not dropping FiO2 extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The intensivist, the tube and not rushing extubation.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Pull the tube, and that they breathe alone.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • weaning
  • ventilators
  • arterial gases
  • sputum
  • extubation
  • FiO2
  • respiratory physio
  • ICU

Sources for this job· O*NET 29-1126.00· ESCO/ISCO 2269

Analyse my job

Jobs with similar scores

  1. 532Mountain guide19%
  2. 533Farrier19%
  3. 534Blacksmith19%
  4. 536Window installer19%
  5. 537Diving instructor19%
  6. 538Climbing instructor19%