IS WORK OVER?

Automation index

How much of a Site engineer’s job can AI already do?

A setting-out comes earlier. The column being where it should without covering bad steel do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Site engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Setting-out, axes and the level.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Rebar, cover and the one that is missing.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Concrete, the slump and not pouring if it fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Note, the diary and not dressing the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The site manager, the rush and not covering bad steel.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the column is there, and not covering the steel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • setting-out
  • axes
  • rebar
  • cover
  • slump
  • site diary
  • levels
  • not cover steel

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

District heating engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Balance, flows and the loss.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Chamber, the leak and the one that weeps.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Substation, the valve and the one that will not open.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Winter, the last block and not leaving it cold.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The council, the tariff and not hiding the loss.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the heat arrives, and not hiding the loss.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • heat balances
  • flows
  • network losses
  • chambers
  • heat substations
  • the last block
  • tariffs
  • leaks

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 603Mountain guide19%
  2. 604Farrier19%
  3. 605Blacksmith19%
  4. 607Shutter installer19%
  5. 608Window installer19%
  6. 609Diving instructor19%