Automation index
How much of a Site engineer’s job can AI already do?
A setting-out comes earlier. The column being where it should without covering bad steel do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Site engineer
19%
AI can already do 19% of this job.
#598 / 743
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Safety engineer
22%
#393 / 743
View rankingSafety engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
HAZOP, nodes and the minute.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the scenario and the one that was not thought.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
SIL, the valve and not jumping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Incident, the lesson and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Management, the cost and not yielding the interlock.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Stop, and not signing the risk that kills.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- HAZOP
- nodes
- SIL
- safety valves
- incidents
- interlocks
- safety minutes
- not jump
Sources for this job· O*NET 17-2111.00· ESCO/ISCO 2141