IS WORK OVER?

Automation index

How much of a Site engineer’s job can AI already do?

A setting-out comes earlier. The column being where it should without covering bad steel do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Site engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Setting-out, axes and the level.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Rebar, cover and the one that is missing.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Concrete, the slump and not pouring if it fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Note, the diary and not dressing the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The site manager, the rush and not covering bad steel.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the column is there, and not covering the steel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • setting-out
  • axes
  • rebar
  • cover
  • slump
  • site diary
  • levels
  • not cover steel

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Tunnel engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Heading, the geology and the support.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Water, the inflow and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Blast, the vibration and the building.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Segment, the ring and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not come down, and not hiding the water.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tunnel headings
  • support
  • inflows
  • blasts
  • segments
  • tunnel geology
  • rings
  • vibrations

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 623Mountain guide19%
  2. 624Farrier19%
  3. 625Blacksmith19%
  4. 627Shutter installer19%
  5. 628Window installer19%
  6. 629Diving instructor19%