Automation index
How much of a Site reliability engineer’s job can AI already do?
A runbook and autoscale come earlier. The 3 a.m. incident without taking production down do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Site reliability engineer
28%
AI can already do 28% of this job.
#103 / 623
View rankingSite reliability engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
SLOs, alerts and the runbook.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Incident, war room and not making it worse.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
CI/CD, capacity and the error budget.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Postmortem, toil and automating the repeated.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The product that wants to ship and the SLO that will not allow it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Not taking production down, and signing the change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- SLOs
- runbooks
- handle incidents
- error budget
- autoscale
- postmortem
- reduce toil
- reliability CI/CD
Sources for this job· O*NET 15-1244.00· ESCO/ISCO 2512
IS WORK OVER?
Astronomer
27%
#134 / 623
View rankingAstronomer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Proposal, time and the instrument.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Observe, calibrate and the one that clouds over.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Reduce, the pipeline and the artefact.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Paper, the referee and not jumping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The facility, the queue and not losing the night.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Reduce, and not selling the find early.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- telescope time
- calibrate
- pipelines
- papers
- artefacts
- nights
- proposals
- instruments
Sources for this job· O*NET 19-2011.00· ESCO/ISCO 2111