IS WORK OVER?

Automation index

How much of a Site reliability engineer’s job can AI already do?

A runbook and autoscale come earlier. The 3 a.m. incident without taking production down do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Site reliability engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
SLOs, alerts and the runbook.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Incident, war room and not making it worse.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
CI/CD, capacity and the error budget.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Postmortem, toil and automating the repeated.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The product that wants to ship and the SLO that will not allow it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Not taking production down, and signing the change.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • SLOs
  • runbooks
  • handle incidents
  • error budget
  • autoscale
  • postmortem
  • reduce toil
  • reliability CI/CD

Sources for this job· O*NET 15-1244.00· ESCO/ISCO 2512

Concrete finisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, joints and thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pour, vibrate and float.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Screed, power float and the right moment.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cure, polythene and the windy day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late mixer and the one who wants water.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack open, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pour concrete
  • vibrate
  • float
  • shrinkage joints
  • power float
  • cure
  • screed
  • slab thickness

Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114

Analyse my job

Jobs with similar scores

  1. 100Photographer28%
  2. 101Tour guide28%
  3. 102Industrial engineer28%
  4. 104Tax inspector28%
  5. 105Inventory clerk28%
  6. 106Store manager28%