Automation index
How much of a Site reliability engineer’s job can AI already do?
A runbook and autoscale come earlier. The 3 a.m. incident without taking production down do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Site reliability engineer
28%
AI can already do 28% of this job.
#103 / 623
View rankingSite reliability engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
SLOs, alerts and the runbook.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Incident, war room and not making it worse.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
CI/CD, capacity and the error budget.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Postmortem, toil and automating the repeated.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The product that wants to ship and the SLO that will not allow it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Not taking production down, and signing the change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- SLOs
- runbooks
- handle incidents
- error budget
- autoscale
- postmortem
- reduce toil
- reliability CI/CD
Sources for this job· O*NET 15-1244.00· ESCO/ISCO 2512
IS WORK OVER?
Crane operator
16%
#595 / 623
View rankingCrane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Lift plan, radii and weights.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Run the crane and place the load.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Signals, wind and exclusion zone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site, foreman and maintenance.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Logs, inspections and machine tests.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Not leaving a load over someone.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 16% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Lift plan, radii and weights
- Run the crane and place the load
- Signals, wind and exclusion zone
- Site, foreman and maintenance
- Logs, inspections and machine tests
- Not leaving a load over someone
- gruista
- operador de grua
- crane operator
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343