IS WORK OVER?

Automation index

How much of a Site reliability engineer’s job can AI already do?

A runbook and autoscale come earlier. The 3 a.m. incident without taking production down do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Site reliability engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
SLOs, alerts and the runbook.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Incident, war room and not making it worse.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
CI/CD, capacity and the error budget.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Postmortem, toil and automating the repeated.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The product that wants to ship and the SLO that will not allow it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Not taking production down, and signing the change.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • SLOs
  • runbooks
  • handle incidents
  • error budget
  • autoscale
  • postmortem
  • reduce toil
  • reliability CI/CD

Sources for this job· O*NET 15-1244.00· ESCO/ISCO 2512

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 100Photographer28%
  2. 101Tour guide28%
  3. 102Industrial engineer28%
  4. 104Tax inspector28%
  5. 105Inventory clerk28%
  6. 106Store manager28%