IS WORK OVER?

Automation index

How much of a Site reliability engineer’s job can AI already do?

A runbook and autoscale come earlier. The 3 a.m. incident without taking production down do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Site reliability engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
SLOs, alerts and the runbook.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Incident, war room and not making it worse.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
CI/CD, capacity and the error budget.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Postmortem, toil and automating the repeated.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The product that wants to ship and the SLO that will not allow it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Not taking production down, and signing the change.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • SLOs
  • runbooks
  • handle incidents
  • error budget
  • autoscale
  • postmortem
  • reduce toil
  • reliability CI/CD

Sources for this job· O*NET 15-1244.00· ESCO/ISCO 2512

Insulation installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, thicknesses and the panel list.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Fit, seal and the bridge you leave.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Roof, façade and the wind on the scaffold.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Barriers, vapour and condensation.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
The designer, the change and late material.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
No bridge, and not crushing the insulation.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fit insulation
  • thermal bridges
  • vapour barrier
  • thicknesses
  • insulated façade
  • condensation
  • seal panels
  • roof

Sources for this job· O*NET 47-2131.00· ESCO/ISCO 7124

Analyse my job

Jobs with similar scores

  1. 100Photographer28%
  2. 101Tour guide28%
  3. 102Industrial engineer28%
  4. 104Tax inspector28%
  5. 105Inventory clerk28%
  6. 106Store manager28%