IS WORK OVER?

Automation index

How much of a Site reliability engineer’s job can AI already do?

A runbook and autoscale come earlier. The 3 a.m. incident without taking production down do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Site reliability engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
SLOs, alerts and the runbook.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Incident, war room and not making it worse.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
CI/CD, capacity and the error budget.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Postmortem, toil and automating the repeated.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The product that wants to ship and the SLO that will not allow it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Not taking production down, and signing the change.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • SLOs
  • runbooks
  • handle incidents
  • error budget
  • autoscale
  • postmortem
  • reduce toil
  • reliability CI/CD

Sources for this job· O*NET 15-1244.00· ESCO/ISCO 2512

Palaeontologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Site, grid and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Dig, consolidate and the one that breaks.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Lab, prep and the mould.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Report, the works and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Theft, the permit and not hiding the piece.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Get it out whole, and not breaking it.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • sites
  • grids
  • consolidate fossils
  • prep
  • moulds
  • dig logs
  • permits
  • works on site

Sources for this job· O*NET 19-3091.00· ESCO/ISCO 2114

Analyse my job

Jobs with similar scores

  1. 100Photographer28%
  2. 101Tour guide28%
  3. 102Industrial engineer28%
  4. 104Tax inspector28%
  5. 105Inventory clerk28%
  6. 106Store manager28%