IS WORK OVER?

Automation index

How much of a Site reliability engineer’s job can AI already do?

A runbook and autoscale come earlier. The 3 a.m. incident without taking production down do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Site reliability engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
SLOs, alerts and the runbook.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Incident, war room and not making it worse.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
CI/CD, capacity and the error budget.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Postmortem, toil and automating the repeated.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The product that wants to ship and the SLO that will not allow it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Not taking production down, and signing the change.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • SLOs
  • runbooks
  • handle incidents
  • error budget
  • autoscale
  • postmortem
  • reduce toil
  • reliability CI/CD

Sources for this job· O*NET 15-1244.00· ESCO/ISCO 2512

Vocational teacher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan modules, rubrics and exams.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Workshop, practice and safety watch.
Estimate

No public source provides a precise figure. This is our estimate.

22%12%+2.6
Tutor placements, firms and difficult students.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Assess, minutes and vocational cycles.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Staff meeting, coordination and workshop stock.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not leaving anyone without a trade or a diploma.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • teach class
  • mark students
  • lesson plans
  • teach
  • Plan modules, rubrics and exams
  • Workshop, practice and safety watch
  • Assess, minutes and vocational cycles
  • profesor de fp
  • vocational teacher

Sources for this job· O*NET 25-2032.00· ESCO/ISCO 2320

Analyse my job

Jobs with similar scores

  1. 100Photographer28%
  2. 101Tour guide28%
  3. 102Industrial engineer28%
  4. 104Tax inspector28%
  5. 105Inventory clerk28%
  6. 106Store manager28%