IS WORK OVER?

Automation index

How much of a Ski instructor’s job can AI already do?

A turn method comes earlier. Getting down the run without taking anyone with them do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Ski instructor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Level, kit and the group.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Run, the turn and the one who cuts across.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Fall, the one who cries and getting them up.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Snow, the storm and closing in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The queue, the pass and not losing a child.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Down whole, and taking nobody with them.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • turns
  • runs
  • falls
  • snow groups
  • the pass
  • the storm
  • get them up
  • ski levels

Sources for this job· O*NET 39-9032.00· ESCO/ISCO 3422

Firmware engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Image, the signature and the slot.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Flash, the batch and the one that bricks.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Rollback, the test and not skipping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Boot, the brick and the one that will not start.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The factory, the cadence and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Flash without bricking, and not skipping rollback.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • firmware images
  • digital signature
  • slots
  • flash
  • rollback
  • boot
  • factory batches
  • not brick

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514

Analyse my job

Jobs with similar scores

  1. 635Workshop teacher19%
  2. 636Dressmaker19%
  3. 637Camp counsellor19%
  4. 639Furniture assembler19%
  5. 640Plasterboard fitter19%
  6. 641Mosaicist19%