Automation index
How much of a Ski instructor’s job can AI already do?
A turn method comes earlier. Getting down the run without taking anyone with them do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Ski instructor
19%
AI can already do 19% of this job.
#522 / 643
View rankingSki instructor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Level, kit and the group.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Run, the turn and the one who cuts across.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Fall, the one who cries and getting them up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Snow, the storm and closing in time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The queue, the pass and not losing a child.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Down whole, and taking nobody with them.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- turns
- runs
- falls
- snow groups
- the pass
- the storm
- get them up
- ski levels
Sources for this job· O*NET 39-9032.00· ESCO/ISCO 3422
IS WORK OVER?
Tram driver
19%
#496 / 643
View rankingTram driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Checks, log and the cab.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drive, stops and the pedestrian who steps out.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Badly parked car, calls and Control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Timetable, reliefs and rush hour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The tourist, the bike and not over-hooting.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Hit nobody, and make the terminus.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drive trams
- urban stops
- pedestrians
- badly parked cars
- Control
- rush hour
- cab checks
- terminus
Sources for this job· O*NET 53-4041.00· ESCO/ISCO 8311