Automation index
How much of a Skipper’s job can AI already do?
A course comes earlier. Bringing people and boat whole into harbour do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Skipper
20%
AI can already do 20% of this job.
#556 / 753
View rankingSkipper
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Course, log and the day’s weather.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Helm, the sea and the harbour manoeuvre.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Crew, the novice and the one who is sick.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Breakdown, sail or engine and calling it in time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the charter and not pushing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Whole into harbour, and not trusting the plotter alone.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- courses
- helm
- harbour manoeuvre
- weather
- charter
- novices aboard
- breakdowns at sea
- the plotter
Sources for this job· O*NET 53-5021.00· ESCO/ISCO 3152
IS WORK OVER?
Aerospace technician
19%
#647 / 753
View rankingAerospace technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bench, the protocol and the torque.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Part, the lockwire and the one left loose.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
NDT, the crack and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Engine, the run and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The engineer, the rush and not signing half done.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Torque it, and not leaving the lockwire loose.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test bench
- torque
- lockwire
- aerospace NDT
- engine runs
- protocols
- cracks
- not sign half done
Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115