Automation index
How much of a Skipper’s job can AI already do?
A course comes earlier. Bringing people and boat whole into harbour do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Skipper
20%
AI can already do 20% of this job.
#461 / 633
View rankingSkipper
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Course, log and the day’s weather.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Helm, the sea and the harbour manoeuvre.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Crew, the novice and the one who is sick.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Breakdown, sail or engine and calling it in time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the charter and not pushing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Whole into harbour, and not trusting the plotter alone.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- courses
- helm
- harbour manoeuvre
- weather
- charter
- novices aboard
- breakdowns at sea
- the plotter
Sources for this job· O*NET 53-5021.00· ESCO/ISCO 3152
IS WORK OVER?
Nuclear engineer
24%
#267 / 633
View rankingNuclear engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Neutronics, thermal-hydraulics and the file.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Control room, tests and the set-point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Licence, the regulator and the safety analyses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Outage, reload and spent fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The event, safety culture and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not playing with reactivity, and signing the analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- neutronics
- thermal-hydraulics
- nuclear licence
- reload
- safety analysis
- control room
- spent fuel
- safety culture
Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149