IS WORK OVER?

Automation index

How much of a Small-hydro technician’s job can AI already do?

A turbinable flow comes earlier. Spinning without running dry do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Small-hydro technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flow, set-point and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Turbine, the bearing and the one that sounds.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Gate, the jam and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Low flow, the river and not forcing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The flood, the spill and not leaving it open.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it spins, and not dry.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • turbinable flow
  • bearings
  • gates
  • low flow
  • spills
  • small hydro
  • turbine logs
  • jams

Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131

Petroleum engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reservoir, rate and the well programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Rig, mud and lost circulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Completion, tests and the ops report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Production, water cut and the workover.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
HSE, blowout and the drill that is not a game.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not killing the well, and signing the programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • model reservoirs
  • well programmes
  • drilling mud
  • completion
  • workover
  • water cut
  • well HSE
  • production tests

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 547Battery technician19%
  2. 548Biogas technician19%
  3. 549Hydrogen technician19%
  4. 551Surgical technologist19%
  5. 552Weaver19%
  6. 553Occupational therapist19%