Automation index
How much of a Small-hydro technician’s job can AI already do?
A turbinable flow comes earlier. Spinning without running dry do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Small-hydro technician
19%
AI can already do 19% of this job.
#550 / 643
View rankingSmall-hydro technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Flow, set-point and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Turbine, the bearing and the one that sounds.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Gate, the jam and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Low flow, the river and not forcing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The flood, the spill and not leaving it open.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it spins, and not dry.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- turbinable flow
- bearings
- gates
- low flow
- spills
- small hydro
- turbine logs
- jams
Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131
IS WORK OVER?
Power-plant operator
19%
#527 / 643
View rankingPower-plant operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-point, parameters and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Room, alarms and the one that trips.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Start, stop and not skipping the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Maintenance, isolation and the permit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, the grid and not forcing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The set-point, and not tripping.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- set-points
- control room
- plant SOP
- starts
- isolations
- alarms
- dispatch
- the grid
Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131