IS WORK OVER?

Automation index

How much of a Solar installer’s job can AI already do?

A roof study and a quote come earlier. Climbing the roof, anchoring, and not falling do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Solar installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Roof study, shade and quote.
Estimate

No public source provides a precise figure. This is our estimate.

18%42%+7.6
Permits, reports and orders.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Fit structure, modules and cabling on roofs.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Inverter, commissioning and measurements.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Heights, anchors and weather.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Client, community and easements.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Roof study, shade and quote
  • Permits, reports and orders
  • Inverter, commissioning and measurements
  • Heights, anchors and weather
  • Client, community and easements
  • placas solares
  • instalador fotovoltaico
  • solar installer

Sources for this job· O*NET 47-2231.00· ESCO/ISCO 7411

Battery technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
BMS, SOH and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Module, the imbalance and the one that swells.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Shop, isolation and not shorting.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Thermal, the fire and the protocol.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The vehicle, the warranty and not swapping blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No fire, and the module right.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • BMS
  • SOH
  • modules
  • imbalance
  • swelling
  • isolation
  • thermal fire
  • battery warranty

Sources for this job· O*NET 17-3023.00· ESCO/ISCO 3113

Analyse my job

Jobs with similar scores

  1. 431Executive housekeeper21%
  2. 432Illustrator21%
  3. 433Waterproofer21%
  4. 435Train conductor21%
  5. 436Marine engineer21%
  6. 437Mediator21%