Automation index
How much of a Solar installer’s job can AI already do?
A roof study and a quote come earlier. Climbing the roof, anchoring, and not falling do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Solar installer
21%
AI can already do 21% of this job.
#425 / 633
View rankingSolar installer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Roof study, shade and quote.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 42% | +7.6 |
Permits, reports and orders.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Fit structure, modules and cabling on roofs.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Inverter, commissioning and measurements.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
Heights, anchors and weather.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Client, community and easements.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Roof study, shade and quote
- Permits, reports and orders
- Inverter, commissioning and measurements
- Heights, anchors and weather
- Client, community and easements
- placas solares
- instalador fotovoltaico
- solar installer
Sources for this job· O*NET 47-2231.00· ESCO/ISCO 7411
IS WORK OVER?
Excavator operator
18%
#574 / 633
View rankingExcavator operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, levels and the machine log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Dig, load and the batter that comes in.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Services, the blind pipe and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Maintenance, grease and the pin that snaps.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The labourer, the lorry and covering nobody.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Not breaking what is buried, and leaving a clean formation.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- dig with excavator
- load lorries
- batters
- buried services
- set-out levels
- grease the machine
- formation
- site GPS
Sources for this job· O*NET 47-2073.00· ESCO/ISCO 8342