IS WORK OVER?

Automation index

How much of a Solar installer’s job can AI already do?

A roof study and a quote come earlier. Climbing the roof, anchoring, and not falling do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Solar installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Roof study, shade and quote.
Estimate

No public source provides a precise figure. This is our estimate.

18%42%+7.6
Permits, reports and orders.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Fit structure, modules and cabling on roofs.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Inverter, commissioning and measurements.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Heights, anchors and weather.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Client, community and easements.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Roof study, shade and quote
  • Permits, reports and orders
  • Inverter, commissioning and measurements
  • Heights, anchors and weather
  • Client, community and easements
  • placas solares
  • instalador fotovoltaico
  • solar installer

Sources for this job· O*NET 47-2231.00· ESCO/ISCO 7411

Funeral director

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Paperwork, chapel, burial and cremation.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Collection, thanatopraxy and care of the body.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
The family, the wake, and what is and is not possible.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Notice, flowers, hearse and the minute-by-minute of the rite.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Cemetery, times and suppliers.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Dignity, legal times and owning the service.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • arrange funerals
  • file death paperwork
  • collect the deceased
  • support the family
  • thanatopraxy
  • run the wake
  • arrange cremation
  • notices

Sources for this job· O*NET 39-4031.00· ESCO/ISCO 5163

Analyse my job

Jobs with similar scores

  1. 431Executive housekeeper21%
  2. 432Illustrator21%
  3. 433Waterproofer21%
  4. 435Train conductor21%
  5. 436Marine engineer21%
  6. 437Mediator21%