IS WORK OVER?

Automation index

How much of a Solar installer’s job can AI already do?

A roof study and a quote come earlier. Climbing the roof, anchoring, and not falling do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Solar installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Roof study, shade and quote.
Estimate

No public source provides a precise figure. This is our estimate.

18%42%+7.6
Permits, reports and orders.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Fit structure, modules and cabling on roofs.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Inverter, commissioning and measurements.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Heights, anchors and weather.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Client, community and easements.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Roof study, shade and quote
  • Permits, reports and orders
  • Inverter, commissioning and measurements
  • Heights, anchors and weather
  • Client, community and easements
  • placas solares
  • instalador fotovoltaico
  • solar installer

Sources for this job· O*NET 47-2231.00· ESCO/ISCO 7411

Safety engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
HAZOP, nodes and the minute.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, the scenario and the one that was not thought.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
SIL, the valve and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Incident, the lesson and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Management, the cost and not yielding the interlock.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Stop, and not signing the risk that kills.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • HAZOP
  • nodes
  • SIL
  • safety valves
  • incidents
  • interlocks
  • safety minutes
  • not jump

Sources for this job· O*NET 17-2111.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 501Executive housekeeper21%
  2. 502Illustrator21%
  3. 503Waterproofer21%
  4. 505Train conductor21%
  5. 506Marine engineer21%
  6. 507Mediator21%