IS WORK OVER?

Automation index

How much of a Solar installer’s job can AI already do?

A roof study and a quote come earlier. Climbing the roof, anchoring, and not falling do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Solar installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Roof study, shade and quote.
Estimate

No public source provides a precise figure. This is our estimate.

18%42%+7.6
Permits, reports and orders.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Fit structure, modules and cabling on roofs.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Inverter, commissioning and measurements.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Heights, anchors and weather.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Client, community and easements.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Roof study, shade and quote
  • Permits, reports and orders
  • Inverter, commissioning and measurements
  • Heights, anchors and weather
  • Client, community and easements
  • placas solares
  • instalador fotovoltaico
  • solar installer

Sources for this job· O*NET 47-2231.00· ESCO/ISCO 7411

Tower crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Radius, winds and the day’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hoist, trolley and the slinger’s call.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Erect, climb and the base that is checked.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Two-crane lifts and crossing jibs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wind that gets up and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sweep nobody, and not pushing the radius.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tower-crane lifts
  • load charts
  • climb the crane
  • slinger’s call
  • jib wind
  • crossing jibs
  • crane base
  • trolley

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Analyse my job

Jobs with similar scores

  1. 431Executive housekeeper21%
  2. 432Illustrator21%
  3. 433Waterproofer21%
  4. 435Train conductor21%
  5. 436Marine engineer21%
  6. 437Mediator21%