IS WORK OVER?

Automation index

How much of a Solar installer’s job can AI already do?

A roof study and a quote come earlier. Climbing the roof, anchoring, and not falling do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Solar installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Roof study, shade and quote.
Estimate

No public source provides a precise figure. This is our estimate.

18%42%+7.6
Permits, reports and orders.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Fit structure, modules and cabling on roofs.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Inverter, commissioning and measurements.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Heights, anchors and weather.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Client, community and easements.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Roof study, shade and quote
  • Permits, reports and orders
  • Inverter, commissioning and measurements
  • Heights, anchors and weather
  • Client, community and easements
  • placas solares
  • instalador fotovoltaico
  • solar installer

Sources for this job· O*NET 47-2231.00· ESCO/ISCO 7411

Welding engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
WPS, the coupon and the qualification.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Shop, the bead and the one who skips the procedure.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
NDT, the fail and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Site, the position and the wind.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The client, the rush and not signing the extra overlap.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the bead holds, and not signing the overlap.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • WPS
  • coupons
  • welder qualification
  • beads
  • NDT
  • positions
  • overlaps
  • welding procedures

Sources for this job· O*NET 17-2141.00· ESCO/ISCO 2144

Analyse my job

Jobs with similar scores

  1. 510Executive housekeeper21%
  2. 511Illustrator21%
  3. 512Waterproofer21%
  4. 514Train conductor21%
  5. 515Marine engineer21%
  6. 516Mediator21%