IS WORK OVER?

Automation index

How much of a Soldier’s job can AI already do?

A log and a drill plan come earlier. Carrying, obeying, and not over-firing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Soldier

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Logs, written orders and paper logistics.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Classroom drill and simulators.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Physical drill, weapons and field.
Estimate

No public source provides a precise figure. This is our estimate.

22%6%+1.3
Operations, watch and deployment.
Estimate

No public source provides a precise figure. This is our estimate.

18%8%+1.4
Unit life, discipline and comrades.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Command or be commanded in a real incident.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%14%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Logs, written orders and paper logistics
  • Classroom drill and simulators
  • Physical drill, weapons and field
  • Operations, watch and deployment
  • Unit life, discipline and comrades
  • Command or be commanded in a real incident
  • militar
  • soldado
  • soldier
  • ejercito

Sources for this job· O*NET 55-1011.00· ESCO/ISCO 0110

HVAC engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Loads, flows and the plant.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Works, the duct and the one they crushed.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Commissioning, the balance and the room that sweats.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Noise, the grille and not leaving the whistle.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the saving and not killing the fresh air.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not sweat, and not oversizing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • load calcs
  • air flows
  • ducts
  • balancing
  • grilles
  • fresh air
  • whistles
  • HVAC plant

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 755Fashion model15%
  2. 756Fisher15%
  3. 757Surgeon14%
  4. 759Hairdresser14%
  5. 760Paramedic14%
  6. 761Nanny13%