Automation index
How much of a Sonographer’s job can AI already do?
A slice protocol comes earlier. Finding the fetus and not saying too much do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Sonographer
20%
AI can already do 20% of this job.
#558 / 743
View rankingSonographer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocols, IDs and worklists.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Scan, measure and capture slices.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 12% | +2.6 |
Calm, explain and not jump a diagnosis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Brief the radiologist and archive the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Probes, gel and kit maintenance.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Pregnancy, bad news and shoulder ergonomics.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Protocols, IDs and worklists
- Scan, measure and capture slices
- Calm, explain and not jump a diagnosis
- Probes, gel and kit maintenance
- tecnico en ecografia
- ecografista
- sonographer
Sources for this job· O*NET 29-2032.00· ESCO/ISCO 3211
IS WORK OVER?
Bridge engineer
22%
#391 / 743
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142