Automation index
How much of a Sonographer’s job can AI already do?
A slice protocol comes earlier. Finding the fetus and not saying too much do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Sonographer
20%
AI can already do 20% of this job.
#479 / 643
View rankingSonographer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocols, IDs and worklists.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Scan, measure and capture slices.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 12% | +2.6 |
Calm, explain and not jump a diagnosis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Brief the radiologist and archive the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Probes, gel and kit maintenance.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Pregnancy, bad news and shoulder ergonomics.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Protocols, IDs and worklists
- Scan, measure and capture slices
- Calm, explain and not jump a diagnosis
- Probes, gel and kit maintenance
- tecnico en ecografia
- ecografista
- sonographer
Sources for this job· O*NET 29-2032.00· ESCO/ISCO 3211
IS WORK OVER?
Industrial engineer
28%
#102 / 643
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141