Automation index
How much of a Sonographer’s job can AI already do?
A slice protocol comes earlier. Finding the fetus and not saying too much do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Sonographer
20%
AI can already do 20% of this job.
#558 / 743
View rankingSonographer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocols, IDs and worklists.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Scan, measure and capture slices.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 12% | +2.6 |
Calm, explain and not jump a diagnosis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Brief the radiologist and archive the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Probes, gel and kit maintenance.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Pregnancy, bad news and shoulder ergonomics.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Protocols, IDs and worklists
- Scan, measure and capture slices
- Calm, explain and not jump a diagnosis
- Probes, gel and kit maintenance
- tecnico en ecografia
- ecografista
- sonographer
Sources for this job· O*NET 29-2032.00· ESCO/ISCO 3211
IS WORK OVER?
Railway engineer
22%
#396 / 743
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142