IS WORK OVER?

Automation index

How much of a Sound technician’s job can AI already do?

A patch and a check come earlier. Hearing it, and no feedback, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Sound technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Patch, rider and a first check.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Mix, mic and not let it feed back.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Stage, in-ears and quick changes.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Artist, director and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cables, spares and strike.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not leaving a gig mute.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Patch, rider and a first check
  • Mix, mic and not let it feed back
  • Stage, in-ears and quick changes
  • Artist, director and production
  • Cables, spares and strike
  • Not leaving a gig mute
  • tecnico de sonido
  • sonidista
  • sound technician

Sources for this job· O*NET 27-4014.00· ESCO/ISCO 3521

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 709Upholsterer18%
  2. 710Taxi driver18%
  3. 711Lighting technician18%
  4. 713Nail technician18%
  5. 714Veterinary technician18%
  6. 715Actor17%